Manesar Facility The 600 acre Manesar facility located around 25 kms south of Gurgaon facility was inaugurated in February 2007. The Manesar facility houses two fully integrated plants with a capacity of 5.5 lakh units annually. The third assembly line is in advanced stage of completion and is expected to be completed in the year 2013. Both manufacturing facilities are highly automated with advanced robotics, contemporary paint, weld and machining infrastructure. While the different models can be assembled on same lines, inter plant flexibility helps to increase productivity. On a single line diverse car models can be made conveniently. Automatic tool changers, centralized weld control systems and advance numerical control machines help for quick change over between models. |